翻訳と辞書 |
Sangtuda 2 Hydroelectric Power Plant : ウィキペディア英語版 | Sangtuda 2 Hydroelectric Power Plant
Sangtuda 2 Hydroelectric Power Plant is a Tajik hydroelectric power plant on the Vakhsh River. ==History== Construction commenced during the Soviet period in the 1980s, but halted in the beginning of the 1990s due to lack of financing. In 1995, Iran expressed interest in helping to finish the project, but an agreement was not signed until 2005. Building work restarted on 20 December 2006.〔 〕〔 〕 The first unit was inaugurated on 6 September 2011 by presidents Emomalii Rahmon and Mahmoud Ahmadinejad.〔 〕
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Sangtuda 2 Hydroelectric Power Plant」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|